Powder Room
We currently do not have pricing available for powder rooms and half baths.
Typical Hall Bath (5′ X 8′)
On the pricing chart below; the “Basic“, “Mid” & “Upper” levels, distinguish which finish you choose.
INCLUDED: Space planning and layout design with our designer, a dedicated project manager, and all labor & materials. access to our customer portal where you can monitor progress and design selections via your phone and computer.
NOT INCLUDED: Permit fees, smoke detector upgrades (code requirement for most areas), painting or staining, decorative light fixtures, mirrors, and bath accessories.

Basic-Level
$25K+
- Keep Existing Tub
- Ceramic Tile Floor & Shower Walls
- Level 1 Plumbing Fixtures
- Level 1 Vanity Cabinetry
- Level 1 Granite Remnant Top
- Electrical Updates
- Shower Door NOT Included
- Fixtures Remain in the Same Locations

Mid-Level
$35K+
- Replace Existing Tub with Tub or Fiberglass Shower Base
- Porcelain Tile Floor & Shower Walls
- Level 2 Plumbing Fixtures
- Level 2 Vanity Cabinetry
- Granite/Quartz Remnant Top
- Electrical Changes/Updates
- Shower Door NOT Included
- Fixtures Remain in the Same Locations

Upper-Level
$50K+
- Remove Tub & Replace with Tile Base Shower
- Porcelain or Natural Stone Tile Floor & Shower
- Level 3 Plumbing Fixtures
- Level 3 Vanity Cabinetry
- Granite/Quartz Remnant Top & Shower Pieces
- Electrical Changes/Updates
- Custom Shower Doors
- Fixtures May Be Moved
Pricing Your Bathroom Remodeling Project
Larger Master Bathroom
On the pricing chart below; the “Basic“, “Mid” & “Upper” levels, distinguish which finish you choose.
INCLUDED: Space planning and layout design with our designer, a dedicated project manager, and all labor & materials. access to our customer portal where you can monitor progress and design selections via your phone and computer.
NOT INCLUDED: Permit fees, smoke detector upgrades (code requirement for most areas), painting or staining, decorative light fixtures, mirrors, and bath accessories.

Basic-Level
$45K+
- Replace Existing Tub & Shower Base with New Fiberglass Tub & Shower Base (Keep Existing Sizes & Locations)
- Porcelain Tile Floor & Shower Walls
- Level 2 Plumbing Fixtures
- Level 2 Vanity Cabinetry
- Granite/Quartz Remnant Top
- Electrical Changes/Updates
- Custom Shower Doors
- Fixtures Remain in the Same Locations

Mid-Level
$65K+
- Remove Existing Tub & Shower. Expand Existing Shower with Mudbase Tile Shower (Tub is Not Included)
- Porcelain Tile Floor, Shower Base & Walls
- Level 3 Plumbing Fixtures
- Level 3 Vanity Cabinetry
- Granite/Quartz Remnant Top & Shower Pieces
- Electrical Changes/Updates
- Custom Shower Doors
- Limited Fixture Movement

Upper-Level
$90K+
- Remove Existing Tub & Shower. Install New Tub, Expanded Mudbase Tile Shower with Seat
- Natural Stone Floor, Shower Base & Walls
- Appliances May be Moved to Other Locations
- Level 4 Plumbing Fixtures
- Level 3 Vanity Cabinetry w/Linen Cabinet
- Granite/Quartz Remnant Top & Shower Pieces
- Electrical Changes/Updates
- Custom Shower Doors
- Fixtures May be Moved